Case Studies

Briary Energy Ltd engages with a variety of clients and contractors to find new ways to improve and optimise energy strategies. Here is a sample of case studies from some of the projects we’ve worked on.

Contact us at info@briaryenergy.co.uk for more information on these projects or to see if we can help you with yours.

Case Study 1

Case Studies Briary Energy 6

Case Study 2

Case Studies Briary Energy 6

Case Study 3

Case Studies Briary Energy 6

Case Study 1

8x Terraced / Detached Properties

  • 3 & 4 bed properties
  • Brick and block constructions
  • Gas heating
  • Total Ground Floor Area = 350m²
  • Total External Wall Area = 900m²
  • Total Sloped Roof Area = 400m²

Aim

To achieve a perfect balance of cost savings and running costs while meeting regulations.
Case Studies Briary Energy 5
Case Studies Briary Energy 4
Case Studies Briary Energy 6

Results

Proposed Changes

  • Replacing Premium PIR products with cheaper cavity batts/standard PIR
  • Use our Bespoke Thermal Bridging calculations for the bridging details

Effects on SAP rating

  • Proposed Specification – All B Ratings
  • Cost Saving Specification – All B Rating

Cost Comparison

Initial

Proposed

Total Savings £40,520.83

Case Study 2

22x Flats / Terraces / Semi-Detached / Detached

  • 22 Development site of flats and houses
  • Plans showed Flue Gas Heat Recovery units were to be installed

Aim

Find a solution to remove Flue Gas Heat Recovery units.
Case Studies Briary Energy 3

Results

Cost savings and benefits

  • Removed Time+Temperature Zone control from the smaller plots which allowed for cheaper heating controls
  • More efficient and cheaper boiler installed
  • Removed the need for Flue Gas Heat Recovery System

Cost Comparison

Initial

Proposed

Total Savings £17,820.00

Case Study 3

88x Terraced / Semi-Detached / Detached Properties

  • 1 & 2 bed properties
  • Brick and block constructions
  • Gas heating
  • Total Ground Floor Area = 45 – 105m²

Aim

Reduce overall costs of building materials used while maintaining energy efficiency ratings.
Case Studies Briary Energy 1
Case Studies Briary Energy 2

Results

Proposed changes

  • Replacing Premium PIR products with cheaper cavity batts/standard PIR
  • Use our Bespoke Thermal Bridging calculations for the bridging details

Effects on SAP rating

  • Proposed Specification – All B Ratings
  • Cost Saving Specification- All B Rating

Cost Comparison

Initial

Proposed

Total Savings £101,963.44